GCID Hardening Electrical Improvements Project
The project generally includes: furnishing and installing Automatic Transfer Switches at both locations, connection of generators at both locations, and furnishing and installing instrumentation for a 300,000 gallon bolted steel storage tank.
Plan Holders
Date | Company | Contact |
6/6/24 7:50 am | Ample Electric inc.
P.O.Box 456 WINTERS, CA 95694 | Katie Reineck Vice President of Operations Tel: 5307959913 Fax: 5307959951 |
5/2/24 9:55 am | Bay Area Builders Exchange
3055 Alvarado Street San Leandro, CA 94577 | Jeannie Kwan Plan Room Coordinator Tel: 510-483-8880 Fax: 510-352-1509 |
5/8/24 8:05 am | Construct Connect | Rye Jumuad Tel: 323.602.5079 |
5/2/24 9:55 am | Construction Bidboard, Inc.
11622 El Camino Real # 100 San Diego, CA | 000 Plan Room Tel: 800-479-5314 |
5/6/24 12:03 am | Dodge Data & Analytics
2860 S State Hwy 161 Ste 160 #501 Grand Prairie, TX 75052 | Jayalakshmi L Other Tel: 413-376-7032 Fax: 609-336-2767 |
6/5/24 10:28 pm | Lords Electric Inc
1513 Sports Dr Ste100A SACRAMENTO, CA 95834 | valentin vizitiu Tel: 9164102386 |
5/2/24 9:55 am | Placer County Builders Exchange
10656 Industrial Ave Suite 160 Roseville, CA 95678 | Kellie Russell Tel: 916-771-7229 |
5/2/24 9:55 am | Sacramento Regional BX
1331 T Street Sacramento, CA 95814 | Plan Room Tel: 916-442-8991 |
5/21/24 3:31 pm | SCC Electric Inc.
1301 Grant Avenue, STE B Novato, CA 94945 | Charlie Slack Presidente Tel: 4152090229 Fax: 4152090228 |